🏛️ Official Application: Online submission on National Jobs Portal (NJP). Submit before 09 Dec 2026.
Application Deadline: 09 Dec 2026
Job Overview & Summary
Organization
Private Power & Infrastructure Board (PPIB)
Total Positions
1 Vacancies
Job Type
Contract
Grade / Scale
Govt Scale (PPS-11)
Experience Required
2+ Years
Minimum Education
Minimum four-year Bachelor’s degree (B.E./B.Sc./B.S., 16 years of education) in Electrical, Power, Energy, Renewable Energy, Mechanical or Civil Engineering from an HEC-recognized university. An MBA, MPA, Master’s in Project/Construction Management or relevant higher technical qualification is an added advantage but is not a substitute for the prescribed engineering degree. Experience: At least 15 years of relevant post-qualification experience in implementation or management of power/energy or major infrastructure projects, including at least 7 years in project leadership, senior management or responsibility for multi-contract EPC project delivery. Preferred Experience: Preference shall be given to candidates having experience in the successful implementation and completion of similar projects, particularly utility-scale solar PV, BESS, public-sector/PSDP-funded projects, regulatory interfaces and project execution in mountainous or remote regions.
Pay / Salary
Govt Pay Scale PPS-11
Apply Before
09 Dec 2026
Job Description & Role Mission
Role purpose Head the PPIB Project Management Unit for Solar Works (PMU-Solar) and be accountable for planning, coordination and timely delivery of the solar components of the 100 MWp GB project within the sanctioned scope, budget and implementation arrangements. Key responsibilities Lead the PMU-Solar, establish the integrated execution programme, monitor milestones, expenditure, quality, risks and corrective actions for rooftop and utility-scale PV, associated BESS and plant-level C&C/SCADA. Oversee formal takeover of solar-project records, ongoing procurements and contractual obligations from W&PD GB, including Rooftop Lots I & II, Lot III and applicable consultancy contracts, through duly approved arrangements. Coordinate procurement and contract administration for the remaining solar packages, including the utility-scale plants, in collaboration with the relevant PPIB sections and the appointed consultants. Direct and coordinate the inputs of EPC contractors, NESPAK and the independent TPV consultant; ensure that review findings, non-conformities, milestone verification and payment-related conditions are resolved and recorded. Maintain an integrated interface schedule with W&PD GB/PMU Non-Solar for site access, grid interconnections, transmission/distribution facilities and project-wide C&C/SCADA without assuming execution of those non-solar packages. Oversee project financial planning, PSDP reporting and approved payment processing, contract risks, stakeholder coordination, O&M transition and final handover, through competent/authorized officers. Prepare or coordinate reporting to PPIB, Power Division, the Steering Committee and Planning Commission, including progress, PC-III/RBM information, completion/PC-IV inputs and audit responses. Prepare annual cash and work plans before commencement of each financial year and oversee the operation and management of project accounts in accordance with applicable financial rules and approved arrangements. Regularly update project progress in the prescribed Planning Commission reporting systems, including PMES/iPAS, as applicable, and prepare quarterly and annual progress reports. Establish performance indicators for PMU-Solar personnel and periodically evaluate their performance. Ensure proper maintenance and custody of all project documents, accounts, assets, contractual records and audit reports. Exercise delegated administrative, functional and financial powers in accordance with applicable rules and remain accountable for decisions taken during project implementation. Minimum eligibility Qualification: Minimum four-year Bachelor’s degree (B.E./B.Sc./B.S., 16 years of education) in Electrical, Power, Energy, Renewable Energy, Mechanical or Civil Engineering from an HEC-recognized university. An MBA, MPA, Master’s in Project/Construction Management or relevant higher technical qualification is an added advantage but is not a substitute for the prescribed engineering degree. Experience: At least 15 years of relevant post-qualification experience in implementation or management of power/energy or major infrastructure projects, including at least 7 years in project leadership, senior management or responsibility for multi-contract EPC project delivery. Preferred Experience: Preference shall be given to candidates having experience in the successful implementation and completion of similar projects, particularly utility-scale solar PV, BESS, public-sector/PSDP-funded projects, regulatory interfaces and project execution in mountainous or remote regions.
Eligibility Criteria & Quota
Gender
Male / Female
Domicile / Quota
Balochistan Quota
Age Limit
18 - 30 Years (Federal Relaxations Apply)
Eligible Degrees / Certificates
🎓 BS Mechanical Engineering🎓 BS Electrical Engineering (power)🎓 Master of Engineering🎓 BE Civil Engineering🎓 BS Electrical Engineering (General)🎓 BE Electrical Engineering🎓 BE Mechanical Engineering🎓 BSc Mechanical Engineering🎓 BSc Civil Engineering🎓 BS Electrical Engineering🎓 BE Energy and Environmental Engineering🎓 BSc Electrical Engineering (Power)🎓 Master of Engineering (Civil Engineering)🎓 BS Civil Engineering Technology
Official Recruitment Application
Ready to apply for Project Director - Solar Works?
This official government vacancy at Private Power & Infrastructure Board (PPIB) requires online application submission through National Jobs Portal (NJP). Submit before 09 Dec 2026.